PM Surya Ghar rooftop solar partner

Rajasthan sun on your roof.
Zero bijli bill at home.

On-grid rooftop solar for homes, shops, industries and farms across Hindaun City, Karauli and nearby towns - designed, installed and serviced by Madhav Electric, your local electrical experts.

  • Free site survey
  • Subsidy paperwork done for you
  • JVVNL net metering
Up to ₹78,000 subsidy
Savings calculatorLive
₹3,000
You save every month ₹2,760 about ₹33,120 a year
System
2.5 kW
Payback
2.3 yrs
Subsidy
-
Get my full estimate

No obligation · takes 30 seconds

200+Happy customers
800 kW+Capacity installed
30 YearsPanel warranty
48hLocal service response
Your numbers

See your savings before we visit

Worked out with the same rates we use in our written quotations. Move the slider to your monthly bill.

Savings estimator

What will your rooftop save?

₹ 4,000
-System
-Save / month
-Payback
 
See my full estimate
PM Surya Ghar Yojana

Government pays part of your home system

1 kW
₹30,000
2 kW
₹60,000
3 kW +
₹78,000

Credited to your bank account after commissioning. We file the whole claim.

Madhav Electric team at work
Electricians first

Our own licensed team wires every plant

Earthing, DB and every connection - the part most solar faults come from.

25yr

Panel performance warranty on Tier-1 Adani and Waaree modules.

JVVNL net metering

Feasibility, net meter and national portal paperwork - followed up by our office, not you.

Right here in Hindaun City

A breakdown is attended by people who live here, usually within 48 hours.

What we do

Complete solar solutions under one roof

All services
How solar powers your home

From sunlight to a zero bill - in five steps

1

Sunlight hits the panels

Tier-1 modules on a galvanised structure turn sunlight into DC power.

2

Inverter converts it

DC becomes the same AC power your wiring and appliances already use.

3

Your home uses it first

Fans, lights, AC and motor run on your own free power during the day.

4

Extra units go to the grid

The net meter exports what you do not use to JVVNL.

5

Your bill comes down

Exported units are adjusted against night-time use - the bill drops to near zero.

SOLAR PANELS INVERTER YOUR HOME + 0 1 2 NET METER JVVNL GRID
How it works

From first call to subsidy in your account

01

Free site survey

We check the roof, shadows and your sanctioned load, and size the plant honestly - not to the biggest number we can sell.

Day 1
02

Written quotation

Bill of material, expected generation, savings, subsidy and total cost in one document. Nothing hidden in the fine print.

Within 24 hours
03

Installation

Structure, panels, wiring, earthing and commissioning by our own licensed team.

2-3 days on site
04

Net meter & subsidy

JVVNL net meter and the PM Surya Ghar claim, followed up by our office until the money reaches your account.

We chase it, not you
05

Enjoy free power

Your meter runs backwards all day. Our service team stays one call away for the next 25 years.

25 years of savings
Our work

Installations we have commissioned

Homes, shops, schools and factories running on Madhav Electric rooftops.

Elevated rooftop plant - Hukmikhera Elevated rooftop plant - HukmikheraHukmikhera, Rajasthan · Residential Home rooftop plant - Kyarda Khurd Home rooftop plant - Kyarda KhurdKyarda Khurd, Hindaun City · Residential Twin-row rooftop plant - Tirupati Nagar Twin-row rooftop plant - Tirupati NagarTirupati Nagar, Hindaun City · Residential Home rooftop plant - Mohan Nagar Home rooftop plant - Mohan NagarMohan Nagar, Hindaun City · Residential Two-array rooftop plant - Suroth Two-array rooftop plant - SurothSuroth, Rajasthan · Residential Home rooftop plant - Karauli Home rooftop plant - KarauliKarauli, Rajasthan · Residential
See every
installation
Photo gallery
Customer stories

maine 3.5kw Tata Power ka Plant Madhav Electric se Install karvaya market me kai jagah rate li or other vendors ki side bhi dekhi lekin Madhav electric ka Rate or kam karne ka Tareeka bank loan me support discon se fast work such Kuch bahut hi Super Laga. enki Tea Bhi Bahut Achchi hai sabse Badiya mujhe ye bhi Lagi enki ki Solar Lagvane me Hame Keval bank me 10 Minute ko loan ke liye jana pada or koi bhi kam ya other kharcha hamne nahi diya sub kuchh enki team hi complate karnti hai Thanks Madhav Electric Thanks Arun ji

NK ★★★★★Naresh Kumar hindaun City · 3.5 system

hindaun me Sabse best Solar Wale Best Solar Panel Qulity, maine Genus Ka Hybrid Inverter Lagvaya Best Service hai enki

LD ★★★★★Laxmi Devi Hindaun City · 3.0kr system

Mera bijli ka bill ab jake nagetive me dekha hai nahi to sardiyo me bhi 4200-4500 se kam nahi aata tha Thanks PM Thanks Madhav Electric

MJ ★★★★★Monika Jadaun KARAULI · 8.0 system

Bill 3,600 se 250 rupaye par aa gaya. Subsidy ka poora kaam Madhav Electric ne khud kiya, mujhe ek bhi chakkar nahi lagana pada.

RG ★★★★★Rakesh Gupta Hindaun City · 3 kW system

Cold room ka monthly bill 36,000 tha, ab 9,000 ke around hai. Installation ke baad bhi Arun ji ki team regular visit karti hai.

MA ★★★★★Mahesh Agarwal Hindaun Mandi · 15 kW system

Site survey se commissioning tak sirf 10 din lage. Wiring ekdum saaf aur neat, roof par koi damage nahi hua.

SS ★★★★★Smt. Sunita Sharma Hindaun City · 5 kW system

Farm house par light ka bahut problem tha. Hybrid system ke baad raat ko bhi backup milta hai.

RM ★★★★Ramkesh Meena Todabhim · 7.5 kW system
Questions

Everything people ask before going solar

Still have a question?

Talk to Arun Singh Dagur directly - no call centre, no pressure.

How much subsidy do I get under PM Surya Ghar?
For a residential connection the Government of India pays Rs 30,000 for a 1 kW system, Rs 60,000 for 2 kW and Rs 78,000 for 3 kW and above. The amount is credited directly to your bank account after commissioning and net-meter installation. Commercial and industrial connections are not covered by this scheme.
How much roof area is needed?
Roughly 100 sq ft of shadow-free roof per kW on a standard structure. A 3 kW home system needs about 300 sq ft. On an elevated structure the space below stays fully usable.
What happens to the electricity I do not use?
With net metering your extra units are exported to the JVVNL grid and adjusted against your consumption in the same billing cycle, so your meter effectively runs backwards during the day.
How long does the whole process take?
Site survey and design takes 2 days, material delivery 3 to 5 days and installation 2 to 3 days. Net meter installation depends on JVVNL and usually takes 2 to 4 weeks after commissioning.
What is the warranty?
25 years performance warranty on modules (30 years on TOPCon), 5 to 10 years on the inverter as per make, and 5 years workmanship warranty from Madhav Electric. The first 12 months of maintenance are free.
Does solar work in the monsoon?
Generation drops on heavily clouded days but does not stop. Rajasthan gets over 300 sunny days a year, and the surplus from the dry months balances the monsoon through net metering.
Free site visit

Let's switch on your savings.

Tell us your average bill and location. The survey is free, and the quotation tells you exactly what the plant costs, what it saves and when it pays back.

Madhav Electric installation team on a rooftop